Letter~by Aarti Mittal
1 de Abril de 2017, 12:34Letter
********
A letter from you
Enveloped with fragrance of love
With the feel of you
Has made my life to move
A letter from you is the meaning to my life
That cuts the emptiness like a knife
A letter from you has bloomed a flower of hope
To be able to find a pearl in the ocean
To count the stars in the sky
A letter from you has not only changed my path my routine
But also my habits my cusine
A letter from you has set my eyes to the door
Waiting for more
The envelop fragranced
Though with words invisibled
Read the volumes
Like on desert blow sandunes.
Aarti Mittal
Wonder Still Exists
1 de Abril de 2017, 12:34Oldest Daughter & Red Headed Sister
functions transposed
believability a mystery
hidden, as intended
wonder still exists
pressure lingers
faith’s instigator
yet, vastness continues
discovery imperative
Big red camellias
1 de Abril de 2017, 12:22.
.
A beautiful Haiku written by AshiAkira
…
Big red camellias
All of them looking toward me
As I opened the door
…
You can read more amazing Haiku here:
Fool’s Day – Fatal Day
1 de Abril de 2017, 10:02BY : TANUSHREE
It was the most beautiful day of my life, I was all set to jump on the next stage as a wife. Every thing was looking so perfect, the decorated house, sweets, music, love i was receiving. My heart was thanking god for the moment that was arriving.
It was two days left for our wedding, My beloved would be, called me, I was so happy to see his name flashing on my phone. A hurricane of excitement was running in my blood.
He said come out from your house, his voice was in pain. I literally ran with confusion and worry in my mind. When i opened the door, he was standing right in front of me, his body was shivering and it was blood all over the shirt.
My heart pumped so fast and i could count the beats of my heart. My body was…
Ver o post original 60 mais palavras
Imagem do dia: Aquário do Pantanal – ‘Elefante branco’
1 de Abril de 2017, 10:01O Aquário do Pantanal, localizado nos altos da Avenida Afonso Pena, que em maio de 2011 começou a ser construído e que tinha previsão de ser entregue em março de 2013, hoje se encontra com as obras interrompidas e não há previsão para a conclusão. A obra, que inicialmente custaria R$ 84 milhões, já consumiu R$ 200 milhões e ainda precisará de mais R$ 68,8 milhões, quando reativada. Ver reportagem completa de Vitória Ribeiro na Página A5 do jornal “O Estado MS” de hoje (01/04/2017). A foto supimpa é de Valentin Manieri.
http://www.oestadoonline.com.br
*****